Page History
...
Training is also required for the use of the Bridgeport Mill. This class is broken into two sections; a self-study session that covers controls, safety, etc. and a second session with some hands on demonstration.
Documentation
- Training Manual: http://www.productivity.com/content/customer/docs/Haas%20Mill%20Operator%20Manual.pdf
- Training Manual 2022: https://www.productivity.com/wp-content/uploads/2022/08/Haas-Mill-Operator-2022.pdf
- Tool Crib and Post-Processor: https://drive.google.com/drive/folders/0B_oJbFh0ODyfbDZ5R3JiX0F6RUU?usp=sharing
- Installation Guide
- Layout drawing
- Service Manual (1994) - superseded by 2002 Service Manual below
- Haas Site 2002 Operator's Manual for VF Series: https://www.haascnc.com/content/dam/haascnc/en/service/manual/operator/english---vf-series-operator's-manual---2002.pdf (Also stored on committee drive)
- Haas Site 2002 Service Manual for VF Series: https://www.haascnc.com/content/dam/haascnc/en/service/manual/service/english---vf-series-service-manual---2002.pdf (Also stored on committee drive)
HAAS Care & Feeding
...
All HAAS Users
- Beginning & End of Each use (Every 8 hrs for long running jobs)
- Check coolant level - DO NOT ADD WATER, ALERT HAAS TEAM OF ISSUES
- Check Way Lube lubrication tank level (prime ways every 2hrs of use)
- Clean chips from way covers and bottom pan (move chips into the auger channel) - IF ANY
- Clean chips from the tool changer - IF ANY
- Wipe spindle taper with clean cloth
- Wipe inside of front windows with clean cloth
...
So we can get with the last user and ensure they are aware of these needed steps.
HAAS Mill Pictures (Onsite)
HAAS Mill Pictures (Offsite)
Dylan's "Tool Setup"
-Get block indicator and position on table -Push MDI DNC -Type G128 then push WRITE/ENTER -Push START -Push HANDJOG -Push OFFSET and page up or down to get to the tool list -Push Z-axis -Jog down until indicator reads zero -Make sure cursor is over the right tool number under GEOMETRY -Push TOOL OFFSET MEASUR -Check to make sure the new Measurement is 5in. more than Z POSTION: measurement -if not then you forgot to use G128 -Push NEXT TOOL and repeat last 4 instructions for all tools
Dylan's Instructions for Setting X and Y-axis
-power machine on -push power up/restart -push SETNGGRAPH -page up or down until you see turn off door overide -turn off, push WRITE/ENTER -load edge finder tool -load and secure material in place -Push HANDLE/JOG -page up/down to get to operator page -Push MDI DNC -Type S1250 M03; this makes the spindle rotate -Press cycle start -Push HANDLEJOG -touch off on one side of the material -always use .001 increments to touch off -always use .01 to move, NEVER .1 -push ORGIN to set axis to 0.00 -TOuch off on the opposite side -divide length by 2 -move spindle to calculated point -Push ORIGIN to set center point to 0.00 -repeat for other axis -Push STOP, in OVERRIDES section to stop spindle -PUsh OFSET twice -Change G54, or needed G-code to zero by pushing PART ZERO SET -When origin is set to one side or corner, touch off the side and offset for the diameter of the edge finder (0.1)
Specs
TABLE SIZE: 36" X 14" TRAVELS: 30" X 16" X 20" TAPER: 40 SPINDLE SPEED: 7500 RPM MAIN MOTOR: 15HP ATC POSITION: 20 EQUIPPED WITH INDEXER OR ROTARY TABLE: NO EQUIPPED WITH 5-AXIS CAPABILITY: NO
Critical Thinking
Known Issues List
- Door limit switch in need of repair
- ATC limit switch alignment
- ATC tool pockets need to be replaced
- Updated Chip extractor (address coolant loss when removing chips)
- ATC clutch service/replacement
- Remove T-nuts and Tread table
- Re-face Table top and machine slots for Kurt vice
- 3D-Print or buy plugs for holes in table
Lance's Site Prep Input
Placement Diagrams
Resources
Fusion 360 models
- Table: Native to Fusion 360. (Fusion 360) Data Panel / CAM Samples / Machine Tables / Haas / VF-2
- Vise: Kurt DX688, modeled as Kurt DX6. Download from Kurt as IGES model and upload into Fusion 360.
...