• Maintenance


    • General

      • Floors Vacuumed
      • Desks wiped / cleaned       
      • Clean off computer mouse and keyboards 
      • Complete any software upgrades on PCs
      • Purgatory area reviewed for overfilling./ updating.
      • Check Drawers for tools


    • Polly Printers

      • Interior vacuumed
      • Bed tape replaced (as needed)
      • preventative maintenance as needed
      • Lemon Pledge Enclosures


    • Bambu Printers

      • Interior Vacuumed
      • Wash plates
      • Oil / lube Z-axis Lead Screws
      • Clean off X-axis Carbon Rods
      • Clean off Micro Lidar lens
      • Clean of time-lapse camera
      • Replace Cutters Every 4 months.  Next: November 2025.
      • Other preventative maintenance. (check maintenance screen for messages)


    • Belt Printer

      • Vacuumed
      • Clean belt
      • Lube / Other preventative maintenance


    • Resin Printers

      • Clean printers as needed. (Keith supervise)


  • Artistic Projects

    • Steam Punk Dragon (Jason)

      • Review printed parts are cured or uncured.
      • Remove supports from finished prints. (Delicate work)
      • Assemble
      • Paint


    • Phoenix
      • Print remaining part (Left wing)
      • Assemble
      • Paint
    • Maria Model
      • Bond sand assemble
      • Paint
    • B9 robot
      • Build
      • Paint
  • No labels